Under the direction of the ROAHPS Board of Directors, the following progress has been made in preperation for renovation of the Teacherage .

 

gazebo has been repaired

Gazebo Teacherage 1 1

the roof has been painted

Painted roof 1

the interior has been demolished to the wood

Inside twoard rear entrance

the windows have been covered to prevent vandalism

Porch 1

the grounds are maintained

Back porch

the back and side porches have been refurbished

Back porch

the front porch being demolished in preparation for new porch 

Near the end of the decking demolition

the new front porch that was completed in March 2025

New front porch

A new roof has been installed